Make your payment easier:
-
30% deposit upon ordering
Confirm your project with a 30% deposit when ordering to reserve your air conditioning installation.
-
20% on the day of installation
A 20% payment is made on the day of installation, once the work has been completed by our team.
-
50% - 30 days after installation
The remaining 50% is due upon receipt of the final invoice, within 30 days for greater flexibility.
Collection: Portable
-
Ecofort ecoQ CoolAir 16 pro
Vendor:EcofortRegular price CHF 1,315.00Regular priceCHF 1,525.00Sale price CHF 1,315.00Sale -
SaleWhirlpool PACF 212HP
Vendor:WhirlpoolRegular price CHF 889.50Regular priceCHF 989.50Sale price CHF 889.50Sale -
Bosch Home Comfort Cool 4000
Vendor:BoschRegular price CHF 859.90Regular priceCHF 959.90Sale price CHF 859.90Sale -
Electrolux EXP34U339CW - Comfort 600
Vendor:ElectroluxRegular price CHF 949.50Regular priceCHF 1,049.50Sale price CHF 949.50Sale
Nous proposons aussi des climatiseurs pour les commerces et espaces alimentaires
Voici les types de climatiseurs additionnels que nous installons selon vos besoin.
Cassette
Gainable
Plancher-Plafond
Terms of Sale and Installation Information
Works not included in our services:
- Masonry work
- Electrical work
- Sanitary supply
- Painting work
- Lifting equipment
- Locksmith work
Included in the price:
- Project study
- Installation plans
- Electrical and refrigeration diagrams
- Equipment supply
- Complete installation
- Commissioning and adjustments
Warranty:
2-year warranty against all installation defects and manufacturing flaws.
Delivery time:
- The intervention period will be agreed upon receipt of the first down payment.
- In case of purchase of a device only (without installation), delivery is free throughout Switzerland and carried out at your convenience, according to your availability.
Installation requirements:
- This installation is offered turnkey: all the elements necessary for setting up the system are included in our offer.
- The price includes standard refrigeration piping up to 2 meters.
- Any additional piping beyond 2 meters will be charged extra.
Power supply:
Regarding electricity, you will simply need to provide a power outlet for the device.
Condensate drainage:
- Water flows from the indoor unit during operation.
- It is therefore necessary to provide for condensate drainage, for example to the outside near the outdoor unit if possible.
- Otherwise, another drainage solution can be considered.



